VSILow Voltage
Washington Court House, Ohio · Electrical & Mechanical Installations

POWER.
FLOW.
SIGNAL.
ONE RISER.

VSI LOW VOLTAGE SOLUTIONS LLC installs building systems across three risers from Washington Court House, Ohio: the power & signal riser — electrical, low-voltage, controls, alarms and communications; the flow riser — HVAC, plumbing, gas, refrigeration and suppression; and the specialty riser — doors, elevators, rigging, insulation and equipment set-in-place. One hundred seventy-three services. One crew.

FIG. 01 — SECTION, NORTH WING RISERS
L4L3 L2L1 L0 RISER-ERISER-MRISER-X PP IDF AHU LTG CHW SEC BAS VSI RISER R-173 SET SHT 1/3 N
The Verticals

THREE RISERS,
ONE CREW.

Building systems divide cleanly into three risers: everything that carries a signal or a current, everything that moves air or water, and everything heavy or unusual that gets set in place. VSI runs all three from one shop.

RISER E · POWER & SIGNAL

Electrical & Low Voltage

Electrical contracting, wiring, panels, lighting, alarms, controls, building automation, communications, fiber, solar, generators and structured cabling — 49 circuits.

Riser-E schedule →
RISER M · AIR & FLOW

Mechanical & Plumbing

HVAC, ductwork, boilers, chillers, hydronics, refrigeration, plumbing fixtures, gas piping, sprinklers and suppression — 77 circuits.

Riser-M schedule →
RISER X · SET IN PLACE

Specialty Installation

Doors, elevators, escalators, conveyors, rigging, millwright work, insulation, power equipment, vehicle lifts and specialty apparatus — 47 circuits.

Riser-X schedule →
The Schedule

FIGURES ON
THE PANEL.

173Services Scheduled
03Risers Fed
77Mechanical Circuits
01Shop — Washington Ct Hs, OH
The Sequence

HOW WORK
GETS LANDED.

Every circuit on the schedule goes through the same four steps — whether it's a fiber splice or an escalator set.

SEQ 01

Scope

The circuit is written: location, trade, code requirement and acceptance criteria before anything opens up.

SEQ 02

Rough

Conduit, piping, rigging and supports land first — inspected before cover-up.

SEQ 03

Connect

Devices, equipment and terminations land on the riser — tested to code and spec.

SEQ 04

Verify

Testing, balancing, commissioning records and as-built marks close the circuit out.

FIG. 02 — THE CIRCUIT CARD PANEL SCHEDULE CKT LOAD USE E-** PWR/SIG RISER-E M-** AIR/FLOW RISER-M X-** SPECIAL RISER-X 173 CKTS · ON SCHEDULE
Why One Shop

EVERY SYSTEM
ON ONE CREW.

Buildings don't separate trades — the riser doesn't care whether a line carries 480V, chilled water or a dumbwaiter cable. VSI was built for the whole riser: power and signal work beside air and flow, beside the specialty apparatus that lands the building's systems in place.

From the shop in Washington Court House, Ohio, one crew scopes, roughs, connects and verifies across all three risers — so the electrician and the millwright never surprise each other in the same ceiling.

GOT A CIRCUIT
TO LAND?

Tell the shop which riser the work belongs to — power & signal, air & flow, or set-in-place — and we'll scope it.

Contact the Shop